Display Warehouse
Focal Wall Instructions
![]() |
![]() |
![]() |
| Measure wall area and find the center of the wall. | Measure and cut out electrical outlets, if applicable. | Install main 12" on center slatwall panel, make sure panel is level.. |
![]() |
![]() |
![]() |
| Screw main panel to wall. | Install 2 foot slatwall sections left and right. | Line up vertical slots. |
![]() |
![]() |
![]() |
| Screw the three panels to wall. | ||
![]() |
![]() |
![]() |
| Done. | Measure wall and cut slatwall if necessary. | Make sure you leave 3/4 inch for trim. |
![]() |
![]() |
![]() |
| Cut out electrical outlets if necessary. | Measure, level and install 8 foot sections. | |
![]() |
![]() |
![]() |
| Install remaining slatwall panels. | Install furring above 4x8 slatwall panels (for the height of backing, JIG will be provided). | Install furring on both sides for facia above slatwall. |
![]() |
![]() |
![]() |
| Install furring on slatwall for supports. | Install lower base. | Slide supports into furring and nail in. |
![]() |
![]() |
![]() |
| Done | ||
![]() |
![]() |
![]() |
| Screw canopy together, if applicable. | Place canopy on top of supports and screw into wall. | Done. |
![]() |
![]() |
![]() |
| Level and screw in trusses. | Measure all the way to the edge of the wall, in case facia needs cutting. | |
![]() |
![]() |
![]() |
| Staple facia to furring. | ||
![]() |
![]() |
![]() |
| Done. | Put in canopy lights | Slide in left and right bases. |
![]() |
![]() |
![]() |
| Shim if necessary. | Apply edge trim to slatwall | |
![]() |
||
| This is what the unit should look like when completed. |